Friday, 18 March 2016

Boat work part ??? I have lost count now - Watermaker install

So the watermaker finally arrived and it is a Spectra Ventura 150 manual. When I saw the size of the box that it came in I was left wondering how it was going to fit on the boat. However it was packed really well to protect it and once all the foam came out it was more managable. The next week it looked like a bomb had hit the boat as it turned into a workshop, floorboards came up, holes were drilled, tools came out and the dinning room table became the work bench. But hey its a boat and there is only so much space. Finally install was completed by me by myself in about 6 days which I though was pretty quick.

Getting ready got the final step of putting in the filter membrane and pump
All done now just to clean up
Other little projects were done as well such as make the dock step into a collapsable one to save space